orbital-studio repair work: the room has the six-focus spine, the control rail is back on the viewport, write-side auth is back on signed cookies, and the stale public truth surfaces are being swept before portal work resumes.
active trackorbital studio: trust sweep
machine gates first, then the eye gate. the window and desk portals are still the soul work, but the site stops lying about its current state first.
ships
pnpm 10 CI install proof, signed-cookie write guards, a viewport-anchored apartment focus rail, and a sitemap/title/canonical cleanup.
latest signal7184a34
accept documented promotion arguments
snapshot generated 25 Aug 2026. build head 7184a34. full ledger at /changelog.
recent ships
the last few things that survived the room.
01accept documented promotion arguments7184a34 / 25 Aug 2026
02accept Vercel GitHub SHA metadatafbedda3 / 25 Aug 2026
03public-access: cover the now snapshot routec90f272 / 25 Aug 2026
04ink-studio: clear React lint gatecd73953 / 25 Aug 2026
05public-access: the opening โ floor derives from the register, everything built is open (ADR-0010)b97ddb3 / 25 Aug 2026